Bridge Crossing Delays

0

Brenda Stockton-Grundt from Wawa-News reports that crossing the Sault Bridge into Canada is very slow due to construction. There is only one lane open leading up to the toll booths which has traffic backed up all the way back to the Three Mile exit.

“It has taken us 40 minutes to get from the 3 Mile Exit to the Easterday Ramp”, said Brenda.