Expect Delays on Canadian Side of International Bridge

0
bridge plaza

Please be advised that Avery Construction will be implementing a lane closure on the International bridge beginning this evening, September 11th at 6pm and lasting through to Tuesday evening, September 12th at 6pm.

During this time, there will be a short section of the bridge ramp near Canada Customs that will be down to one lane of traffic and controlled by traffic control persons to keep traffic flowing in both directions. This temporary lane closure is necessary to allow the construction company to complete roadway reconstruction and paving on the south side of the bridge ramp as part of the multi-million bridge plaza project.

If you are planning to travel across the International Bridge during this short period, it is advised to allow more time and expect delays.